figure 2 is representative of the 2 separate PEX ftgs., the ball valve and the boiler drain suggested earlier and posted again below.
figure 3 shows setup.
This guy did 2 zones w/ explanation and all in ~5,5min.
This guy did 2 zones w/ explanation and all in ~5,5min.
Not at the moment. He's just been trying to maintain a fire. It's gone out a couple times because it will crawl up to 200 degrees while it's idling, then it closes the 10% idle air. I had him turn it down to 5%, it seems to be behaving a little better. Here's a graph of the last 24 hours. He wants to add more radiators, not sure how soon and do more with the plumbing.
I was only thinking if he could do a separate loop. Besides, whats wrong with twisty straws..this aint California. lol Wasnt sure how large a feed he had from the Boiler to/from the house. The floor in my garage has @ 576ft of 1/2 copper on a single loop with 2 B&G 100 circ pumps. I wonder what they heated the house with before he got the place and if it ever got warm. I know when 1/2 my concrete floor is warm, its almost "too much" heat for working