Page 7 of 10

Re: EFM-520 Build Thread

Posted: Sun. Oct. 05, 2008 7:44 pm
by kevin12973
DSCN0280.JPG

Assembled boiler base with new plates, gaskets and bushings.

.JPG | 1.5MB | DSCN0280.JPG
DSCN0281.JPG

Boiler set on base using chainfall. Moved over and set to it's final location. Piping started. Oops, forgot cast iron baffle. Luckily squeezed it in from underneath through the ashdoor.

.JPG | 1.4MB | DSCN0281.JPG

Re: EFM-520 Build Thread

Posted: Tue. Oct. 07, 2008 8:17 pm
by kevin12973
DSCN0282.JPG
.JPG | 1.6MB | DSCN0282.JPG
DSCN0283.JPG

rear of boiler piped and tested. Just need to get controls wired.

.JPG | 1.3MB | DSCN0283.JPG

Re: EFM-520 Build Thread

Posted: Tue. Oct. 07, 2008 11:36 pm
by coal berner
Did you put a gasket around the Auger tube coming out of the base can't tell from the pic also how long is the Auger
tube & Augers are you using a barrel or coal bin if you are using a barrel put some gasket around that end of the tube
going into the barrel a auger tube coupling would make it easies to remove the auger & tube if you would have to work
on it or have to remove soming stuck in it That looks like a long run for no coupling

Re: EFM-520 Build Thread

Posted: Wed. Oct. 08, 2008 7:58 pm
by kevin12973
Coal berner, I wrapped the coal pipe twice with 5/8 round gasket. On the barrel end I used a hole saw 2 3/8 ,so it fits tight. The total length or coal pipe is 69". Its one piece and the auger is 2 piece. I thought since I am using a barrel I could easily slide the barrel out of the way and clean ?out the pipe. I hope I am not going to regret this :cry: . Any other thoughts ? Please keep them comming as I am completly new to this and need all of the advice I can get. Thanks for all the great imfo so far. :D

Re: EFM-520 Build Thread

Posted: Wed. Oct. 08, 2008 8:06 pm
by Normy
Looks great!

Looks heavy. How did you get the boiler on top of the base? Was the chainfall attached to the ceiling joist?

Re: EFM-520 Build Thread

Posted: Wed. Oct. 08, 2008 8:35 pm
by kevin12973
I hear 800 lbs. If you look back a page you can see the chain fall hung from a steel beam. No you cant see the beam, but its there, trust me. :D :D

Re: EFM-520 Build Thread

Posted: Thu. Oct. 09, 2008 12:36 am
by coal berner
kevin12973 wrote:Coal berner, I wrapped the coal pipe twice with 5/8 round gasket. On the barrel end I used a hole saw 2 3/8 ,so it fits tight. The total length or coal pipe is 69". Its one piece and the auger is 2 piece. I thought since I am using a barrel I could easily slide the barrel out of the way and clean ?out the pipe. I hope I am not going to regret this :cry: . Any other thoughts ? Please keep them comming as I am completly new to this and need all of the advice I can get. Thanks for all the great imfo so far. :D
Kevin you can always get a coupler later 69" is not that long being you are using a drum but with a coupler on the Auger
tube it makes it even easier to remove the augers & tubes you can cut the tube where the two augers meet and slip in
the coulper you will have to unscrew the augers and pull them apart along with the Auger drum tube with the coulper
on you can just pull the drum ager & tube off and then the pot auger & tube instead of having to pull the whole tube
and two augers off together it will be kind of tuff trying to screw the two agers together with one whole tube on it
if you ever have to take it apart EFM as a two piece split Tube coulper that makes it even easier to put on and off
Somthing to think about

Re: EFM-520 Build Thread

Posted: Fri. Oct. 10, 2008 7:41 pm
by kevin12973
DSCN0285.JPG
.JPG | 1.3MB | DSCN0285.JPG
DSCN0284.JPG

new chimney pipe

.JPG | 1.4MB | DSCN0284.JPG

Re: EFM-520 Build Thread

Posted: Fri. Oct. 10, 2008 7:48 pm
by kevin12973
DSCN0286.JPG

jacket installed. piece missing above coal feed pipe.

.JPG | 1.4MB | DSCN0286.JPG
DSCN0287.JPG
.JPG | 1.5MB | DSCN0287.JPG

Re: EFM-520 Build Thread

Posted: Fri. Oct. 10, 2008 7:54 pm
by kevin12973
Only project left is to wire the motor and controls. I have an electrician friend comming down sunday. I hot wired the motor to hear it run, sweet :D :D :D :D . Everything looks like great. New gear oil in gear box and tub. oiled holes in their locations too. Hope to be burning coal by sunday.

Re: EFM-520 Build Thread

Posted: Sat. Oct. 11, 2008 3:46 am
by Freddy
Gettin' closer! I hope Sunday is a good day for you. Those old oil tanks are looking lonely, scared, deprived. :)

Re: EFM-520 Build Thread

Posted: Sat. Oct. 11, 2008 8:46 am
by kevin12973
Yea, and the oil-man is threatning to take me off his christmas card mailing list. :D :D

Re: EFM-520 Build Thread

Posted: Sun. Oct. 12, 2008 6:08 pm
by kevin12973
SUCCESS. :D :D :D . Fired up with kindleing wraped in news paper, then put a scoop of coal on top when wood was burning good. Took about 20 minutes to get to 160 degrees. Verified my l6006 was working on the way up. Also verified the high limit would shut down the stoker. The timer works as well. Everything is operational. Fire looks even and setting is close for now, #4 and #4 on air. Will check ash ring tommorow when I have one to look at. Nice blue flame about 6" tall. Im very pleased with experiance. So far everybody that came down to see my unit has been amazed . they just did not think coal is a real alternative to oil or wood heat. Plus the unit is amazing by itself. By the way, I used #2 ash buckets (square). Just bent the corners over to make one side 18". Fits like a glove and looks like It was made that way.

Re: EFM-520 Build Thread

Posted: Sun. Oct. 12, 2008 7:20 pm
by Freddy
Yippeee! Congrats on getting the flames to dance. Wooohooooo!

Re: EFM-520 Build Thread

Posted: Sun. Oct. 12, 2008 7:47 pm
by Scottscoaled
Congradulations Kevin, welcome to the club! :) Scott