Need Installation/operation Manual for Power Vent (swgii 4hd) &type Rc Draft Control

Post Reply
 
vince
New Member
Posts: 2
Joined: Mon. Dec. 11, 2006 6:30 pm

Post by vince » Mon. Dec. 11, 2006 9:14 pm

Hello, I am new to the forum and looking for input. I recently purchased a used Alaska Stoker 140 complete with power vent (SWGII 4HD), Type RC draft control and need instalation/operation manual for all pieces. Is there somewhere I can download this info?
Also this system was used for 1 season and sat without use. When I removed it from the property I purchased it from I noticed that the stack pipe before the power vent had a grayish ash build up in the pipe. Is this normal or was the draft set up improper?

 
User avatar
coaledsweat
Site Moderator
Posts: 13767
Joined: Fri. Oct. 27, 2006 2:05 pm
Location: Guilford, Connecticut
Stoker Coal Boiler: Axeman Anderson 260M
Coal Size/Type: Pea

Post by coaledsweat » Mon. Dec. 11, 2006 9:51 pm

The ash is normal, I usually take my stack down twice a year to remove the ash.

These guys can take care of the manual. I'm sure they can E-mail it.
**Broken Link(s) Removed**Same here.
http://www.fieldcontrols.com/venting


 
vince
New Member
Posts: 2
Joined: Mon. Dec. 11, 2006 6:30 pm

Post by vince » Mon. Dec. 11, 2006 10:17 pm

I will e-mail them and find out. Thanks

Post Reply

Return to “Stoker Coal Furnaces & Stoves Using Anthracite (Hot Air)”