I got the shaft today

Posted: Thu. Apr. 04, 2019 12:29 pm
by mntbugy
It's weight is 48000 pounds finish weight. 23 feet 3 inches long. 2 bells are 38 inches in diameter. Center Bell is 32 inch in diameter. Shaft size is 22 inch diameter. I have two of them to do. Guess some more OT.

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 12:53 pm
by tsb
Show progress and finished product.

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 1:15 pm
by Freddy
Beastly! Wow.

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 2:46 pm
by coaledsweat
Whatcha making? Gun barrels for a battleship?

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 9:10 pm
by BigBarney
Drive shaft for ship ?????

BigBarney

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 9:20 pm
by warminmn
New Ford Mustang driveshaft for 10,000 HP model?

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 9:43 pm
by Pauliewog
New shaker handle for the Vestal ?

Paulie

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 11:03 pm
by Keepaeyeonit
So what are you doing to them? Mill to length and center ( and drill and tap the ends if needed ) or tuning them?
I look forward to seeing the finished product ( If thats even allowed :D ) Someone else that works with fairly large stuff :yes:

Re: I got the shaft today

Posted: Thu. Apr. 04, 2019 11:09 pm
by CapeCoaler
Getting a 20% haircut...

Re: I got the shaft today

Posted: Fri. Apr. 05, 2019 10:25 pm
by CoalHeat
And I thought changing the transmission in my Exploder was a big deal...lol.
IMG_3148.JPG
.JPG | 1.1MB | IMG_3148.JPG

Re: I got the shaft today

Posted: Sat. Apr. 06, 2019 4:29 pm
by mntbugy
The shafts got pushed back about 4 weeks.

They both will get centers and rough mill the OD on both ends on the big G&L boring mill using a 90 degree head. Then on the big lathe for turning. A bunch of holes all around parts. Tapped, Bored, and clearance holes. Will take at least 6 weeks or more till they are done machining.

Re: I got the shaft today

Posted: Sat. Apr. 06, 2019 6:52 pm
by Keepaeyeonit
mntbugy wrote:
Sat. Apr. 06, 2019 4:29 pm
The shafts got pushed back about 4 weeks.

They both will get centers and rough mill the OD on both ends on the big G&L boring mill using a 90 degree head. Then on the big lathe for turning. A bunch of holes all around parts. Tapped, Bored, and clearance holes. Will take at least 6 weeks or more till they are done machining.
Nice, what is the spindle size? 6" or 7" I'm guessing! G&L makes a good boring mill as we have had a few but only have a 6" left. The mill I run has a 225 MM ( 8.858" spindle) with 630" in X and 198" in Y and 7 axis. Been on HBM's most of my working career.

Re: I got the shaft today

Posted: Sat. Apr. 06, 2019 7:15 pm
by mntbugy
The big G&L has 7 in spindle. T-slot floor plate 432in on x ,240 on y, z is 96. Small G&L . 6in spindle. X is 156, Y is 104, Z is 48,W is 48 . Rotorary table 84x60.

Have a smaller Cincinnati glibert.
All have 90 degree head attachment.

Biggest stuff at another place, that was all hydo electric turbines. A 600 inch VTL with dual heads.

Re: I got the shaft today

Posted: Sat. Apr. 06, 2019 9:12 pm
by Keepaeyeonit
Nice, Our biggest Farrel VTL will do 480"or 40' dia but the 600" is a big one for sure! We don't do much turning over 24' anymore but we still have the ability ever needed!

Re: I got the shaft today

Posted: Mon. May. 06, 2019 4:06 pm
by mntbugy
Landed the shaft this morning. Took awhile to do still half asleep.

Part is only 10,000 pounds over machine capacity.

Both parts was quoted at 300hours. We might make a couple bucks?

If the part falls out of the chuck, I'm dead.